Hi all & welcome to yet another installment of our building blog. Since the last blog we have had the bricks completed to about 98% done, we are awaiting on them to finish the section above the alfresco door. All electrical, plumbing and framing has been complete and the plaster has been put on. I finally got onto our SS and he indicated the plaster was being delivered on friday just gone which is was and they would commmence on saturday. The wife and I went past yesterday to see the progress only to find the plasterers were there plastering (on a sunday???) We are very pleased with the workmanship of it. We have also had all our eave linings completed and the front fascade is slowly taking shape. the brickworks seems very good as well. We had a preplaster inspection last thursday and there were 11 items picked up. One of which was from our frame inspection which is the slab issue we have in the garage. The others brought up seem like easy fixes again. I hope to see if I can organize a site meeting with the SS and go through things with him. Our SS also informed us that he is leaving Simonds on the 21st March, so we will get what will be our 3rd SS. We were also informed by our SS that the cabinetry should commence this week and painting commence possibly next week. We are getting very excited now. Its becoming a real reality now and we cant wait.
So as usual please enjoy the (30) photo's.

Shot of the eaves down the side of the house (love 'em)



Bricking above alfresco door still needs completing



The Alfresco with the piers completed




Insulation & one of our Ducted vacuum outlets


Ensuite with Cavity door installed as well as insulation

Kitchen with wiring, gas, water & bulk heads installed

Living room with insulation and clipsal star serve wiring


Looking through our front entry door and seeing plaster

Man cave has finally got plaster

Family/dining room with plaster

Looking towards the kitchen Bulk heads look great above kitchen (wife sneaked into the photo for her fame)

Bathroom

Rear passage way

View of living room from passage way

View out to the alfresco

Living room

Front entry hall

From the front door looking through the house



Alfresco roof plastered. Looks great.

2 comments:

  1. hi Harvest, things are really looking brilliant.
    Will you be having a fireplace in your living room?

    Asked my husband about the time line, he coded it, I will ask him to email the code to you.

    ReplyDelete
  2. Thanks EDSCL, yeah we are having a gas fire place in our living room. That was the wifes idea which is a great idea.

    ReplyDelete