Sunday 29 April 2012

Carpet & Video Tour

Hello All,
Well its been a week since the last post and since then we have had the carpet layed, door hardware installed, and a new pallet of stackstone delivered. It has kinda slowed up over the last week or so, however its great to see the floor coverings complete and make it more homey. We are very happy with the colour scheme and how it all blends well together. Its so hard to imagine how all your colours will look when your going through the colour gallery.
I have attached some photo's and a video walk through of our home so i hope you enjoy.

Living Room With Carpet

Living Room With Floor Board Walk Through


Master Bedroom

Master Bedroom Looking Into WIR

Entry Way Through To Other Bedrooms Laundary & Bathroom
& Toilet

Bedroom 2

Bed 3 Look Out & BIR

Bed 3

Door Handles Installed

Front Entry Door


Tuesday 24 April 2012

Tiling Complete & Floorboards

Hello all,
Welcome to yet another installment of our building blog. As the post title suggests the tiling has been completed and the floor boards (Merbau Single Strip) have been laid. The tiles & floor boards both need to be cleaned but both look very good the garage roller door has also been installed. The heater ducts & evaporative cooling ducts have been fitted off.
I called past there this evening before coming home and see that thay have delivered more stack stone so they can finish the fascade. They have installed the taps to the showers and bath and installed the bath tub. All that needs to be done now is finish painting the top part on the roof and the rear garage door. Install the shower screens, mirrors in ensuite & bathroom, robe shelves & sliding mirror doors, linen shelves & pantry shelves. The carpet also needs to be installed in the other rooms as well which I assume wont be done till just be for hand over or our PCI. We also need our fly screens to be installed. Also some final electrical like the alarm & sensors to be installed. So I hope that we might be in there by the end of May.
I think thats all for now. Till the next time enjoy the photo's.




Our Garage Roller Door

Floor Boards (Kitchen/Dining)

Floor Boards (Dining/Family)

Laundary Tiling Complete With Splash Back

Bathroom Tiling Fully Complete

Bathroom Shower Complete

View From Front Entry Door Of The Floor Boards Layed
Throughout The House

Ensuite Shower Tiling Complete


Looking Back To The Front Entry With Floor Boards

Open Plan Area Completed with Merbau 1 Strip Floor Boards


Kitchen Splash Back Tiles Complete

Living Room With Floor Boards Walk thru
(concrete area to be carpet)

Looking Out To The Alfresco




Sunday 15 April 2012

Tiling Commenced & Update

Hi All,
Just a quick update. They have started the tiling of all our tiled areas. They have completed the floor parts of the tiling and need to finish the wall tiles in the ensuite & bathroom showers and complete the tiles around the bath tub. They need to start the splash back tiles in both the laundary & kitchen.
They have completed the section above the front window. It looks a lot better now. That still needs to be painted and everything else on the outside has been painted, including the down pipes.
The driveway has also been layed and matches pretty well to the rest of the fascade colours and deck.
Thats about all for now. Hope you enjoy the photo's.



Laundary With Tiles Layed


Laundary

Main Bathroom With Tiles Layed

Main Bathroom Shower. Tiled Base

Toilet With Tiles


Ensuite With Tiles

Ensuite Shower Base With Tiles

Driveway & Path Complete
 
External Painting Complete


 
Front Fascade With Top Section Finally Finished.

 
Outside Painted As Well As Down Pipes









Alfresco With The Early Morning Sun (8.46am)


Thursday 5 April 2012

Electrical Fit Out & More

Hello all once again.
Well we had our site meeting on Monday afternoon and it went pretty good. We sorted out some issues that we had and he is following up somethings that hadn't been done with the old SS. We had a walk through and they have done a coate of paint and finished the skirting & architraves and the doors. They had also placed the caeserstone on the bench where the oven is and also installed the island bench today. The sparky went through today and fited off all the power points, light switches and lights inside & outside. Its really starting to take shape and getting extremely excited now.
I also noticed that they had delivered the incorrect tiles when i went on the Tuesday after our site meeting, I told them there incorrect and they have replaced them with the correct ones. Lucky they didnt lay any. Our SS wouldnt give us an exact time of hand over but he suspects it shouldnt be to far away, as usual he said wait till the tiling is complete and I'll have more of an indication. They have also commenced fixing the section on the roof above the front window and that should be complete by the end of next week, they have also started doing our stack stone. The painting still need to be done out side and there should be another 1 or 2 coates to do inside as we requested 3 coats.
I think that is about all for now. So as usual enjoy the photo's


Ensuite Vanity with Caeserstone Benchtop (Osprey)


2 Lights Above Vanity Sinks


Master Bedroom With Power Points


Entry Hallway Looking Down The House (downlights Fitted)

Kitchen Caeserstone Bench Tops Fitted with Waterfall Feature on Island Bench (Ivory)


Main Bathroom Also With Caeserstone Bench Top (Osprey)



Down Lights & Batten Lights in Main Area
(Kitchen, Dining, Family)


Ducted Heater & Evaporative Cooling System Thermostat.
Both Controlled By This Controller






Stack Stone Commenced Around Front Bedroom Window



Solar Panel & Evaporative Cooling Unit

Flood Light In Backyard


Alfresco Decking Complete