Tuesday 24 April 2012

Tiling Complete & Floorboards

Hello all,
Welcome to yet another installment of our building blog. As the post title suggests the tiling has been completed and the floor boards (Merbau Single Strip) have been laid. The tiles & floor boards both need to be cleaned but both look very good the garage roller door has also been installed. The heater ducts & evaporative cooling ducts have been fitted off.
I called past there this evening before coming home and see that thay have delivered more stack stone so they can finish the fascade. They have installed the taps to the showers and bath and installed the bath tub. All that needs to be done now is finish painting the top part on the roof and the rear garage door. Install the shower screens, mirrors in ensuite & bathroom, robe shelves & sliding mirror doors, linen shelves & pantry shelves. The carpet also needs to be installed in the other rooms as well which I assume wont be done till just be for hand over or our PCI. We also need our fly screens to be installed. Also some final electrical like the alarm & sensors to be installed. So I hope that we might be in there by the end of May.
I think thats all for now. Till the next time enjoy the photo's.




Our Garage Roller Door

Floor Boards (Kitchen/Dining)

Floor Boards (Dining/Family)

Laundary Tiling Complete With Splash Back

Bathroom Tiling Fully Complete

Bathroom Shower Complete

View From Front Entry Door Of The Floor Boards Layed
Throughout The House

Ensuite Shower Tiling Complete


Looking Back To The Front Entry With Floor Boards

Open Plan Area Completed with Merbau 1 Strip Floor Boards


Kitchen Splash Back Tiles Complete

Living Room With Floor Boards Walk thru
(concrete area to be carpet)

Looking Out To The Alfresco




No comments: