Just a quick update. The brickes are probly 80% done. They have done 95% of one wall and have gone up half way on most of the other walls. They may have some delay on the front of the garage as this needs to be repaired and rectified. The timber studs hang well over and the lip for the garage panel lift door needs to be redone. Other than that its looking very good. So as usual till the next installment enjoy the photo's.
Alfresco Door Has Been Installed |
Rear Of House |
Alfresco Area With Brick Piers |
This would be the look of the standard Kyoto Fascade, but the bricking around the window will be stack stone |
Looking out our big Alfresco door onto the alfresco |
Really like your alfresco doors, very jealous, I should of put them in my house.
ReplyDeleteWe love the alfresco door, it opens the area right up. we only come across it by chance. The back open plan living area is a replica of a display they opened up in our estate and we had just signed our contract and still had a period to change things so we did. Somethings work in mysterious ways.
Delete